Port extension

Port extension

Description of works

  • Extension of a riprap breakwater over 360 m;
  • Conversion of the basin by dredging and rock removal, to moor 700 boats;
  • Construction of 140 m of floating docks in reinforced concrete
     

Project

  • Client: Joint association to build the port of Saint Cast
  • Prime contractor: Departmental Council of Cotes d’Armor
  • Duration: November 2007 to October 2010
  • Amount: €24,000,000 excluding tax
 

Distinctive features and constraints 

  • Tourist site (access and neighbourhood constraints)
  • Exposed coastal site
     

Key figures

  • Rock removal: 130,000 m3
  • Dredging: 330,000 m3
  • Riprap: 210,000 t
  • Piles for floating docks: 115 u
  • Reinforced concrete structures: 1600 m3
  • Extension of the departmental port of Saint-Cast